Inspect before the evidence disappears
Incoming checks establish the identity and condition of supplied material or purchased items. In-process checks can catch drift before more value is added. Final inspection confirms the defined delivered state. A final visual check cannot recover a lost material identity or prove an inaccessible feature that was not checked earlier.
Make the report useful
Identify the drawing revision, part lot, characteristic, method, result and disposition. Define sampling and escalation where applicable. Separate a setup check from a shipment acceptance record. If a result is outside the requirement, record containment and approval before release rather than editing the nominal to match the result.
Review checklist
| Review item | Define before release | Evidence to retain |
|---|---|---|
| Incoming | Identity, condition and required evidence | Receipt record |
| In-process | Setup, drift and hidden features | Traceable process check |
| Final | Delivered finish, function and quantity | Shipment acceptance record |
Worked review example
A bore machined before coating and masked during coating needs a final check that includes masking quality and cleanliness. The earlier bore report alone cannot confirm the delivered condition.
Apply the review to your drawing
Identify the affected features on the current drawing and attach the material, finish and operating requirements that control them. Agree the proposed route and acceptance evidence before releasing a change. Send the controlled files for a project review.