Compare delivered output
A multi-cavity die can produce more parts per cycle, but it also changes projected area, shot requirements, tool size and balancing. Review the available machine and full production route before estimating savings. Count accepted finished parts after casting, machining and coating, not only parts ejected at the machine.
Keep each cavity identifiable
Cavity identification supports trial review and production diagnosis. Compare dimensions, appearance and rejection patterns by cavity. Plan what happens if one cavity needs repair: a nominally high-output tool may become a bottleneck when a shared issue stops all cavities. Include spare inserts and maintenance access where justified.
Review checklist
| Review item | Define before release | Evidence to retain |
|---|---|---|
| Demand | Order size, cadence and product life | Capacity scenario |
| Machine fit | Shot, projected area and die envelope | Engineering review |
| Cavity balance | Dimensions, fill and rejects by cavity | Identified trial report |
Worked review example
Compare one cavity at a shorter cycle with two cavities at a longer cycle using accepted output and tool cost. Cavity count alone cannot show the cheaper route.
Apply the review to your drawing
Identify the affected features on the current drawing and attach the material, finish and operating requirements that control them. Agree the proposed route and acceptance evidence before releasing a change. Send the controlled files for a project review.