Motor Housings & End Covers
Define mounting datums, machined bores, end-cover interfaces and sealing faces. Include mating references, critical dimensions and the inspection condition for the assembled interfaces.
Motor housings, power control enclosures and charging equipment components.
Identify the housing’s role and mating interfaces within the vehicle or charging equipment. Review mounting datums, machined surfaces, sealing and final delivery requirements together.
Define mounting datums, machined bores, end-cover interfaces and sealing faces. Include mating references, critical dimensions and the inspection condition for the assembled interfaces.
Provide enclosure geometry, mounting features, contact surfaces and assembly references. Mark protected areas and the dimensions that must be accepted after machining and finishing.
Define installation interfaces, covers, sealing surfaces and final finish. Include operating conditions, handling protection and any specified tests for the housing.
Include critical features, test methods and required records with the drawing. Cleaning, testing, traceability and customer approval scope are confirmed for the project before order acceptance.
| Requirement area | Define for review | Agree for acceptance |
|---|---|---|
| Mounting & machined interfaces | Datum scheme, bores, mounting faces, hole patterns and mating references. | Critical dimensions, inspection setup and the final condition used to check fit and alignment. |
| Sealing & specified tests | Sealing surfaces, cover interfaces and any required leak or pressure test, including method and conditions. | Test scope, sampling frequency, acceptance criteria and the records required for the component. |
| Cleanliness & surface condition | Controlled surfaces, burr limits, cleaning requirements, finish and protected areas. | Cleaning and inspection scope, surface acceptance and handling or packaging requirements. |
| Traceability & project records | Material records, part/lot identification, drawing revision and customer-specific documentation or approvals. | Identification method, required reports and the review steps for drawing, tooling or process changes. |
Compare material, housing geometry, demand and design maturity before selecting the route. Coordinate tooling, machining, finishing and assembly around the required delivery condition.
Review prototypes and machined components against material condition, stock form, workholding and critical interfaces. Include planned design changes and quantity requirements.
Review manufacturing route →Review the casting alloy, housing geometry, draft and tool layout against the production demand. Identify machined interfaces, sealing faces and any additional inspection requirements.
Review manufacturing route →Connect cast housings to machined datums, bores, threads and sealing surfaces. Agree locating strategy, allowances, deburring, cleaning and final inspection requirements.
Review manufacturing route →Define coating, masked interfaces, appearance criteria and the dimensions inspected after treatment.
Review requirements →Agree dimensional checks, specified leak or pressure tests, cleanliness records and part identification.
Review requirements →Specify inserts, fasteners, fit checks, part identification and packaging against the delivery requirements.
Review requirements →Send the housing drawing together with the mating references and required delivery condition. Identify critical interfaces, applicable tests and the documentation needed for review.
For an illustrative power-control enclosure, identify mounting datums, gasket lands, connector openings, machined interfaces and cleanliness requirements. State whether a leak or ingress test applies to the supplied component or the assembled system, and define the test conditions and limit. Vehicle, battery-pack and crash validation require their own scope; a component inspection report does not establish system approval.
This is a design-review example, not a published customer case. Record the selected route, unresolved decisions and required acceptance evidence against the same drawing revision.
Include mounting datums, machined interfaces, end-cover and sealing references, material specification and critical dimensions. State the required inspection and delivery condition.
Identify the applicable surfaces and test requirements. Provide the test method, conditions, sampling frequency and acceptance criteria, together with cleaning and required record specifications.
Include material records, part or lot identification, required reports and customer-specific approvals with the RFQ so scope can be confirmed before order acceptance.