Map every possible path
The casting wall is only one possible leak path. Gasket geometry, surface finish, fasteners, plugs and joints also matter. Show pressure boundaries, machined lands and minimum remaining walls in the design review. Keep parting lines and gate cleanup under review where they cross a seal.
Define what a passing test means
Record the test medium, pressure or vacuum, stabilization, duration, temperature basis and acceptance limit. Air, liquid and tracer-gas tests are not automatically interchangeable. Decide whether the part is tested before or after coating and assembly. Do not assume a coating or an unspecified repair makes a leaking casting acceptable.
Review checklist
| Review item | Define before release | Evidence to retain |
|---|---|---|
| Boundary | Wall, seal, plug and fastening paths | Marked pressure boundary |
| Test | Medium, conditions and leak limit | Approved procedure |
| State | Raw, machined, coated or assembled | Traceable finished-part result |
Worked review example
A housing that passes before machining may leak after a bore exposes connected porosity. Put the acceptance test after the operations that can change the pressure boundary.
Apply the review to your drawing
Identify the affected features on the current drawing and attach the material, finish and operating requirements that control them. Agree the proposed route and acceptance evidence before releasing a change. Send the controlled files for a project review.